Edit

Step 1: Enter input data files

This is the first step in computing the stakeout data. The required data are the following:

Stakeout — Step 1

  • Point files: Select the project point files you want to use in the stakeout. The computation can continue only if all the selected point files refer to the same reference system.
  • Stakeout maximum distance: Specify the default maximum distance from a station to a target point. You can change this distance individually for each station in Step 2. Beyond that distance, the stakeout data are not computed from a given station.
  • ASCII output file: Enter the name of the output file with the results of the computation. This file can be in html or ASCII format. If the extension of this file is HTM or html, it is treated as html format; otherwise it is treated as ASCII format. You can view this file (with the viewer specified in the Preferences dialog box of the Edit menu) by selecting the check box at the bottom called Show after computation. The file is created in the project directory.

After entering these data, click the Next button to go to Step 2: Station point selection.