Mass diagram
This tool calculates a longitudinal profile showing total road earthworks by chainage. Left-click an existing alignment in Horizontal view when prompted. The program then displays a dialog.

Fields:
- Select vertical alignment: vertical alignment used for the diagram.
- Cross sections settings: profiles where templates are projected to calculate earthworks.
- Interval: spacing in meters.
- Include original points: applies templates at alignment points of interest.
- Start: diagram starting chainage.
- End: diagram ending chainage.
- Scales: graph display scale denominators.
- Other output files: optional ASCII results report.
- Annotations: texts around the diagram, such as name, scales or calculated areas.
- Position: one of eight positions for each text.
- Text code: recording code.
- Text height: text size in meters.
- Lines codes: codes for diagram lines:
- Box: outer frame and lower lines.
- Inner lines: lines inside the frame.
- Volume: line representing earthwork volume.
- Include vertical scale: horizontal interior lines every specified number of m3 of volume.